If you then decide to enter the Festival, make sure that you find out as much as possible about the Theatre where the festival is being held. In particular, the size (width and depth) of the stage, the height of the proscenium opening, sight lines, type and colour of the stage curtains, and, vitally important, the lighting rig. Details of the theatre are given in the Technical Data Package but we recommend that you also contact us to arrange a theatre visit (for at least the director, the stage manager and the lighting person) and a discussion with the Technical Director at an early stage in the planning of your production.
You will be asked to complete various questionnaires giving details of your staging, lighting and sound plots. This is to enable the festival back stage team to anticipate any problem areas or potential conflicts on the use of technical resources.
The Technical Director is there to help but he is not expected to prepare your lighting plot for you – it is your responsibility to provide fully detailed lighting and sound plans to enable your play to be presented.
Detailed preparation for the performance on the Festival stage is essential. Ensure you make effective use of the space available. Make sure the cast are prepared to perform in a different type of theatre – if you generally rehearse and perform in a small village hall, the cast must be prepared to cope with the very different acoustics of a large theatre auditorium.
Make sure you know what colour the stage curtains are. A set, costumes, make-up and a lighting plot carefully designed to be performed in front of pale grey curtains can loose its effect if the stage curtains turn out to be black.
All relevant technical data is included in the Data Pack, and is sent to groups who are taking part.
Please complete and return the technical forms by the required deadline. Failure to provide the necessary technical information in a timely manner could result in disqualification from certain technical awards.